Work programMonday - Friday 08:00 - 16:30Phone number: + 40 241 586 406
SOCIAL MEDIA
Wind farms

Designing and Layout

Wind farms

Designing and Layout


Wind farms

Construction

Wind farms

Construction


Wind farms

Maintenance and upkeep

Wind farms

Maintenance and upkeep


Photovoltaic parks

Designing and Layout

Photovoltaic parks

Designing and Layout


Photovoltaic parks

Construction

Photovoltaic parks

Construction


RIG SERVICE

ONGOING PROJECTS

RIG SERVICE

ONGOING PROJECTS




SPECIALISTS IN GREEN ENERGY

Complex projects


RIG SERVICE specialists handle complex projects in the field of green energy, managing to offer expertise in all stages of implementation, starting from design, continuing with construction and ending by providing maintenance and upkeep services for any type of wind or photovoltaic parks. We deal with photovoltaic panels, solar panels for a green house. We offer Installation, Maintenance and Maintenance services.


WORK STAGES

Experience and professionalism

We offer consultancy in the development of large-scale wind and photovoltaic parks based on a special experience in the field. Building a wind/photovoltaic farm involves a number of complex and technical steps, which include:

Location identification

The location must have enough consistent and strong wind/sun, but also be accessible for transporting equipment.

Feasibility study

Research will include soil studies, wind/solar analyses, environmental studies, economic analyses.

Park design

Plans for foundations, number and type of wind turbines/photovoltaic panels, transmission lines and power stations.

Approvals and Authorizations

Obtaining building approvals, environmental permits and authorizations from regulatory bodies.

Construction

Foundation construction works, installation of wind turbines/photovoltaic panels, construction of transmission lines and power stations.

Putting into service

Wind/photovoltaic farm testing and commissioning, performance verification of turbines/panels and power transmission and distribution systems.

Operating

Once commissioned, the wind farm will need to be operated and maintained regularly to ensure it is operating efficiently and safely

Maintenance and upkeep

Regular inspections of turbines/panels, maintenance of transmission lines and power stations, carrying out repairs in case of breakdowns.


Experience and professionalism

Ready to offer the best solutions!

Green Energy

Projects

Projects

FÂNTÂNA MARE

Energie Eoliana: 92.4 MW

WHERE ARE WE?

  • Land Ownership
  • Urbanism Certificate No. 12/09.02.2023
  • Grid Connection Study – Approved
  • PUZ: final approval stage - expected in Nov 2023
  • Environmental Study: expected in Nov 2023
  • ATR: ongoing - expected in Dec 2023
  • Building approval: Permitting process


Location: Fântâna Mare, Constanța

Storage capacity: 20 MW

Transformation Station

Connection Networks

Communication and access roads

Grid connection 33/110 KV


Projects

INDEPENDENȚA ENERGY

Wind Energy - 112.2 MW

WHERE ARE WE?

  • Land Ownership
  • Urbanism Certificate No. 11/09.02.2023
  • Grid Connection Study – Approved
  • PUZ: final approval stage - expected in Nov 2023
  • Environmental Study: expected in Nov 2023
  • ATR: ongoing - expected in Dec 2023
  • Building approval: Permitting process

Location: Independența, Constanța

Storage capacity: 25 MW

Transformation Station

Connection Networks

Communication and access roads

Grid connection 33/110 KV

Projects

SARAIU RIG SERVICE

Wind Energy - 26.4 MW

WHERE ARE WE?

  • Land Ownership
  • Urbanism Certificate No. 1/09.02.2023
  • Grid Connection Study – Approved
  • PUZ: N/A
  • Environmental Study: expected in February 2024
  • ATR: ongoing - expected in Dec 2023
  • Building approval: Permitting process. Expected in April 2024.


Location: Saraiu, Constanța

Storage capacity: 6 MW

Transformation Station

Connection Networks

Communication and access roads

Grid connection 110 KV


Projects

SARAIU WORLD CLASS

Wind Energy - 26.4 MW

WHERE ARE WE?

  • Land Ownership
  • Urbanism Certificate No. 9/19.12.2022
  • Grid Connection Study – Approved
  • PUZ: February of 2024
  • Environmental Study: expected in February 2024
  • ATR: ongoing - expected in Dec 2023
  • Building approval: Permitting process

Location: Saraiu, Constanța

Storage capacity: 6 MW

Transformation Station

Connection Networks

Communication and access roads

Grid connection 110 KV

Projects

HORIA GREEN

48 MW Solar Hybrid & Hydrogen

WHERE ARE WE?

  • Land Ownership
  • Urbanism Certificate No. 152/24.04.2023
  • Grid Connection Study – Approved
  • ATR: final approval expected in Nov 2023
  • Building approval: Permitting process – expected in Feb 2024


Location: Ovidiu, Constanța

Storage capacity: 24 MW

Transformation Station

Connection Networks

Communication and access roads

Grid connection 110 KV

Projects

SOLAR PLANTS MAINTENANCE

Thanks to variable brush sizes and offset arrangement, cleaning can be carried out economically, quickly and gently with a cleaning width of 2.40m without physical strain for the operator.

General Data

  • Gradeability max. 25°/47°
  • Width of driving pad +/- 0.10 m
  • Driving speed +/- 2.2 km/h
  • Cleaning capacity: 1100 – 2400 mp/h